

Cathedral Square boasts two new hotels
Two new hotels have opened in Cathedral Square, Christchurch in the last three months - the Warners Novotel Hotel and the C1 Tower to which Firth has supplied around 5,000m3 of concrete. Pouring concrete to the C1 Tower required a concrete pump to be craned up to the highest available floor to be able to pump the concrete to the topmost reaches of the building.
